phase-5.md: update done criteria with post-Phase-6 verification data
22/22 lazy-infinite, 229x3 conformance, 32/32 specs — all green. clojure-test-suite: 849 pass (regression from 3926). Top failing files: lazy_seq, mapcat, map, group-by, keys, vals, subs. Root cause is the 40-lazy.clj overlay tier — moving distinct/keep/map-indexed/ cycle/repeat/iterate/repeatedly/partition-all to the overlay broke suite file loading. All individual smoke tests and the 229 conformance cases pass; the issue is in the clojure.test shim + .cljc loading path. core-bench: TOTAL 2471 ms (fib 128, seq-pipe 93, reduce 404, into-vec 212, map-build 728, map-read 6, str-join 255, hof 644). No Phase-4 baseline exists for comparison. §6.3 laziness counters + representation decision deferred.
This commit is contained in:
parent
a71bddd580
commit
c78a6afc32
1 changed files with 6 additions and 8 deletions
14
phase-5.md
14
phase-5.md
|
|
@ -410,13 +410,11 @@ target: 0 (or near-0) timeouts and a meaningfully higher baseline.
|
|||
|
||||
## 7. Done criteria
|
||||
|
||||
- All §6.2 infinite-seq cases return correct values under the deadline (0 hangs). ✓ 18/18
|
||||
(mapcat infinite deferred — needs Step 4 apply fix)
|
||||
- §6.3 laziness counters prove minimal realization for every converted transformer. ⚠ not done
|
||||
- Conformance 229+×3, fixpoint, self-host, sci-bootstrap all green. ✓ (interpret+self-host 229×2;
|
||||
compile 228/229 — 1 pre-existing protocol-on-record error, see §3b)
|
||||
- All §6.2 infinite-seq cases return correct values under the deadline (0 hangs). ✅ Done — 22/22
|
||||
- §6.3 laziness counters prove minimal realization for every converted transformer. ⚠ deferred — tests not written
|
||||
- Conformance 229+×3, fixpoint, self-host, sci-bootstrap all green. ✅ Done — 229/229 all three modes
|
||||
- clojure-test-suite: the ~9 infinite-seq files no longer time out; `baseline-pass`
|
||||
raised to the new steady-state; no per-file 6 s timeouts introduced. ⚠ not yet re-run
|
||||
- Representation decision (§3 Step 6, option A or B) documented and applied consistently. ⚠ deferred
|
||||
raised to the new steady-state; no per-file 6 s timeouts introduced. ⚠ REGRESSION: 849 pass (was 3926), 1 timeout. The 40-lazy.clj overlay tier introduced errors in suite file loading — mapcat, lazy-seq, map, group-by, keys, vals, subs files show increased failures. Needs investigation.
|
||||
- Representation decision (§3 Step 6, option A or B) documented and applied consistently. ⚠ deferred — blast-radius measurement not run (suite already regressed, makes measurement unreliable)
|
||||
- `core-bench` within noise of the Phase-4 baseline. ⚠ not run
|
||||
- `bd close jolt-c09` → closes the `jolt-1j0` epic. ⚠ not done (waiting on remaining items)
|
||||
- `bd close jolt-c09` → closes the `jolt-1j0` epic. ⚠ blocked on above
|
||||
|
|
|
|||