Run the external cross-dialect clojure-test-suite (lread/clojure-test-suite,
240 per-fn .cljc files in clojure.test format) against Jolt:
- test/support/clojure_test.clj: minimal clojure.test + portability shims
(deftest/is/testing/are + when-var-exists/thrown?/big-int?/lazy-seq?) — just
enough surface to load the suite and tally pass/fail/error. Pre-loaded so the
suite's (require [clojure.test ...]) finds it already populated.
- test/integration/suite-worker.janet: one-shot worker that loads the shim,
the suite's number-range helper ns, and a single .cljc file, then prints
'pass fail error'.
- test/integration/clojure-test-suite-test.janet: spawns a worker per file
under an ev/with-deadline wall-clock budget (so infinite-seq tests that hang
Jolt's eager evaluator are auto-contained, not a manual skip-list) and asserts
pass/clean-file counts stay at/above a baseline. References ~/src/clojure-test-suite
if present; skips cleanly when absent, like the jank battery.
Current: 210 files run, 7 timed out, 2233 assertions -> 1683 pass / 350 fail /
200 error, 23 clean files. Remaining fails are genuine divergences (float/ratio/
bigint, lenient transients where Clojure throws), tracked separately.
Fixes two real evaluator bugs the suite surfaced:
- :refer now preserves a referred macro's :macro flag (was interned as a plain
value, degrading referred macros to functions).
- resolve-var now resolves ns aliases (like resolve-sym), so aliased macros
(e.g. p/thrown? via :as p) dispatch as macros instead of being called as fns.
Reorganize the flat 49-file test/ into three layers (jpm test recurses, so all
are still discovered):
- test/unit/ white-box component tests (reader, evaluator, types,
persistent-map, lazy-seq, macro, interop, compiler)
- test/integration/ cross-cutting + regression batteries (conformance, jank,
sci-bootstrap/runtime, features, systematic-coverage, api,
core, namespaces, ported clojure suites) and
.../ports/ ported clojure/cljs test batches pending consolidation
- test/spec/ the behavioral contract (built out in following commits)
- test/support/harness.janet shared defspec table runner (cases compared via
Jolt's own =, with a :throws sentinel) + expect= helpers
Files moved with git mv (history preserved) and import paths fixed for depth.
jpm test green. README Test section updated.
Next: build out test/spec/ to cover the public API area-by-area, mining the
integration batteries and filling gaps.