jolt/test
Yogthos 29fdd8ff7f compiler: interpreter fallback is deliberate-only (Stage 2 Task 3)
compile-and-eval wrapped the compile step in a blanket protect — any failure,
including a genuine compiler bug, silently fell back to the interpreter and
hid behind a correct-looking result. Now only the analyzer's deliberate punt
signal (jolt/uncompilable: …) falls back; any other compile-step error
propagates.

Tightening this surfaced one accidental dependency: pre-kernel overlay forms
(00-syntax's destructure defn) trigger a compile while ensure-analyzer is
still gated, and the missing analyzer crashed var-get with a cryptic indexing
error that the blanket catch happened to convert into the designed interpret
fallback. That path now punts explicitly ("jolt/uncompilable: analyzer not
built (pre-kernel bootstrap)").

New unit test stubs jolt.analyzer/analyze to prove a non-punt error
propagates while the punt channel still falls back.

Gate: conformance 269x3, fallback-zero, fixpoint stage1==2==3, self-host,
sci-bootstrap, staged-bootstrap, all specs+unit, suite 4046>=4034 (5 timeouts);
core-bench A/B neutral (4562 vs 4572 ms).
2026-06-10 08:48:19 -04:00
..
bench Compiler research (#10) 2026-06-09 07:30:25 +08:00
clojure-stdlib/clojure Compiler research (#10) 2026-06-09 07:30:25 +08:00
integration core: fix jolt-265 — syntax-quote fully-qualifies core syms to clojure.core/ (#18) 2026-06-10 11:41:42 +08:00
spec Comprehensive spec (#19) 2026-06-10 20:33:22 +08:00
support Compiler research (#10) 2026-06-09 07:30:25 +08:00
unit compiler: interpreter fallback is deliberate-only (Stage 2 Task 3) 2026-06-10 08:48:19 -04:00