jolt/jolt-core/clojure
Yogthos 790f54d2b3 core: Phase 4 — move future-done?/future-cancelled? to the overlay
Pure reads of the future's :cached/:cancelled slots over future? + get.
future? stays native (deref/future-cancel/realized? call it), as do future-call
and future-cancel (OS threads). Covered by the existing futures spec.
2026-06-07 21:41:11 -04:00
..
core core: Phase 4 — move future-done?/future-cancelled? to the overlay 2026-06-07 21:41:11 -04:00