jolt/test
Yogthos ec30c9e405 Chez concurrency pt.1: real OS-thread futures + blocking promises (shared heap)
future/future-call run the body on a native thread (fork-thread) over the SAME
heap — JVM semantics, not Janet's isolated-heap snapshot. deref blocks on a
mutex+condition latch; timed (deref f ms val) uses an absolute deadline.
promise is a real blocking promise (deref parks until deliver), replacing the
Janet non-blocking atom shim. future?/future-done?/future-cancelled?/future-cancel
/realized? are native (the overlay versions read Janet map keys); re-asserted in
post-prelude over the overlay. pmap/pcalls/pvalues (overlay, over future) light
up for free.

Thread-safety this forces:
- atoms get a per-atom mutex; swap!/swap-vals! are a JVM-style CAS loop (f runs
  outside the lock, so a watch/validator can deref the same atom); reset!/
  compare-and-set! are atomic.
- the dynamic binding stack becomes a Chez thread-parameter, so each future/thread
  has its own; Chez inherits it at fork, giving binding conveyance (the shim also
  installs an explicit snapshot).
- Thread/sleep really sleeps now (a worker sleeping doesn't block the parent).

Re-minted the seed: future-call now resolves at compile time, so pmap compiles to
a var-deref instead of the host-static-call fallback that crashed. image.ss
unchanged.

Corpus: the 2 snapshot cases now match the JVM (shared) not Janet (isolated) —
allowlisted on both Chez gates; the two racy future-cancel cases allowlisted;
"promise undelivered" (blocks on JVM/Chez, profile :bucket :timeout) skipped like
:throws. Zero-Janet corpus 2544 -> 2569, 0 new divergences, floor raised. Full
Janet gate + JVM cert green.

jolt-byjr
2026-06-20 13:11:31 -04:00
..
bench Parallelize the test gate; cache cold-init tests, drop the benchmark from it (#139) 2026-06-16 14:23:02 +00:00
chez Chez concurrency pt.1: real OS-thread futures + blocking promises (shared heap) 2026-06-20 13:11:31 -04:00
clojure-stdlib/clojure Compiler research (#10) 2026-06-09 07:30:25 +08:00
conformance Fix 4 clojure.core bugs surfaced by JVM certification 2026-06-20 11:06:33 -04:00
fixtures/cgen-build cgen: single-binary native build via jolt cgen-build (jolt-a7ds) (#150) 2026-06-16 20:34:10 +00:00
integration Chez Phase 1 (increment 3h): host-interop method-call emit 2026-06-17 18:58:44 -04:00
spec Fix 4 clojure.core bugs surfaced by JVM certification 2026-06-20 11:06:33 -04:00
support core: AOT context image — init-cached recovers the bootstrap cost across processes 2026-06-10 13:57:37 -04:00
unit Reject a malformed catch clause with a clean error in both modes 2026-06-17 17:25:14 -04:00